{"id":5753,"date":"2026-10-12T05:47:21","date_gmt":"2026-10-12T05:47:21","guid":{"rendered":"https:\/\/www.relyirgrass.com\/build-own-tennis-court-backyard-step-by-step\/"},"modified":"2026-11-09T09:24:12","modified_gmt":"2026-11-09T09:24:12","slug":"build-own-tennis-court-backyard-step-by-step","status":"publish","type":"post","link":"https:\/\/www.relyirgrass.com\/ar\/build-own-tennis-court-backyard-step-by-step\/","title":{"rendered":"\u0645\u0627 \u064a\u0644\u0632\u0645 \u0644\u0628\u0646\u0627\u0621 \u0645\u0644\u0639\u0628 \u062a\u0646\u0633 \u062e\u0644\u0641\u064a"},"content":{"rendered":"<style>\nh2 { font-size: 1.6em; line-height: 1.3; margin: 40px 0 18px; }\nh3 { font-size: 1.2em; line-height: 1.35; margin: 26px 0 12px; }\np { line-height: 1.8; margin-bottom: 28px; }\nfigcaption { text-align: center; font-style: italic; }\n.callout-note { border-left: 4px solid #1a5c2e; background: #f3f7f2; padding: 18px 22px; margin: 28px 0; border-radius: 4px; }\n.callout-warning { border-left: 4px solid #b8860b; background: #fdf7e8; padding: 18px 22px; margin: 28px 0; border-radius: 4px; }\n.callout-tip { border-left: 4px solid #2e7d32; background: #f0f7f0; padding: 18px 22px; margin: 28px 0; border-radius: 4px; }\nth { text-align: left; padding: 12px 14px; background: #1a5c2e; color: #ffffff; font-weight: 600; }\ntd { padding: 12px 14px; border-bottom: 1px solid #e0e0e0; }\ntable { display: table !important; width: 100% !important; border-collapse: collapse; margin-bottom: 28px; }\n<\/style>\n<p>Most guides compress a backyard court into one weekend and a rented roller. The owners who build backyard tennis court surfaces in their own gardens describe something else. Before the base ever goes in, they face endless root removal and re-grading. Their layouts are drawn on spaces that turn out too tight for real run-off.<\/p>\n<p>We have watched enough of those builds from the roll side to respect the ones that started with a checklist. This guide therefore treats a court as a sequence of gates, and each gate closes before the next one opens.<\/p>\n<h2 id=\"before-you-dig-the-decisions-that-shape-every-step\">Before You Dig: The Decisions That Shape Every Step<\/h2>\n<p>Four decisions shape everything that follows: the space envelope, the orientation, the paperwork and the digging clearance. None of them need machinery, and all of them get expensive to reverse once work starts. Anyone planning to build backyard tennis court space at home should settle all four on paper before the first shovel.<\/p>\n<figure>\n<img fetchpriority=\"high\" decoding=\"async\" style=\"width:100%;height:auto;border-radius:8px\" src=\"https:\/\/www.relyirgrass.com\/wp-content\/uploads\/2026\/10\/build-own-tennis-court-backyard-step-by-step-slot1.webp\" alt=\"Steel tape measure stretched diagonally across a green textured surface\" width=\"1200\" height=\"800\" class=\"wp-image-5731\" data-img-slot=\"1\" loading=\"eager\" srcset=\"https:\/\/www.relyirgrass.com\/wp-content\/uploads\/2026\/10\/build-own-tennis-court-backyard-step-by-step-slot1.webp 1200w, https:\/\/www.relyirgrass.com\/wp-content\/uploads\/2026\/10\/build-own-tennis-court-backyard-step-by-step-slot1-300x200.webp 300w, https:\/\/www.relyirgrass.com\/wp-content\/uploads\/2026\/10\/build-own-tennis-court-backyard-step-by-step-slot1-1024x683.webp 1024w, https:\/\/www.relyirgrass.com\/wp-content\/uploads\/2026\/10\/build-own-tennis-court-backyard-step-by-step-slot1-768x512.webp 768w, https:\/\/www.relyirgrass.com\/wp-content\/uploads\/2026\/10\/build-own-tennis-court-backyard-step-by-step-slot1-18x12.webp 18w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/><figcaption>A tape across green space &#8211; before any drawing exists, the site gives you its true length and width.<\/figcaption><\/figure>\n<h3>Space and the Run-Off Envelope<\/h3>\n<p>The playing lines themselves are fixed by the sport. A singles court measures 78 ft (23.77 m) long and 27 ft (8.23 m) wide. The doubles court widens to 36 ft (10.97 m). Both sets of dimensions are given per <a href=\"https:\/\/www.itftennis.com\/media\/7221\/2026-rules-of-tennis-english.pdf\" target=\"_blank\" rel=\"noopener\">the ITF Rules of Tennis<\/a>. Those numbers never change, which makes them the easiest part of the whole project.<\/p>\n<p>The lines are only half the story, because run-off decides whether the court actually plays. Per <a href=\"https:\/\/cits.wa.gov.au\/sport-and-recreation\/sports-dimensions-guide\/tennis\" target=\"_blank\" rel=\"noopener\">the WA Government sports dimensions guide<\/a>, a club-level single court needs 34.77 m x 17.07 m in total once run-off is included. The same source allocates 5.48 m of clear space behind each baseline and 3.05 m along the sides. Converted, that footprint is roughly 114 ft x 56 ft. A backyard that fits only the lines gives you a court you cannot chase a ball on.<\/p>\n<h3>Orientation and Sun<\/h3>\n<p>Orientation is the one decision you get exactly once. The optimum axis is north-south, which keeps low morning and evening sun out of players&#8217; eyes, per Tennis Australia&#8217;s facility planning and development guide. Where the plot will not allow it, the same guide suggests weighing building shade, prevailing wind and tree planting rather than forcing the ideal line. A court that stares into the setting sun becomes unwearable for half of every summer evening.<\/p>\n<h3>Permits and the Call Before You Dig<\/h3>\n<p>Ground that has never been opened can still hide gas, water and power lines, and excavation is where DIY confidence meets the regulator. The paperwork here is lighter than most owners expect, but it is not optional.<\/p>\n<p>You reach the system by dialling 811 anywhere in the US, per <a href=\"https:\/\/primis.phmsa.dot.gov\/stakeholder-comms\/CBYD\/\" target=\"_blank\" rel=\"noopener\">PHMSA call-before-you-dig guidance<\/a>. Every state runs a one-call centre, state law requires 48 to 72 hours notice before digging, and the call and the utility marking are free. The rule reaches every project, down to planting a shrub. Operators send crews to mark buried lines with flags or paint, and that mark-up becomes your excavation map.<\/p>\n<h2 id=\"groundwork-site-prep-slope-and-the-base\">Groundwork: Site Prep, Slope and the Base<\/h2>\n<p>Groundwork is where the plan to build backyard tennis court facilities meets the soil you actually have. Roots come out, topsoil gets stripped, and the subgrade is graded to a plan before anything is laid on top. Site prep and slope decide more about ball bounce than any later step does.<\/p>\n<figure>\n<img decoding=\"async\" style=\"width:100%;height:auto;border-radius:8px\" src=\"https:\/\/www.relyirgrass.com\/wp-content\/uploads\/2026\/10\/build-own-tennis-court-backyard-step-by-step-slot2.webp\" alt=\"Vibratory roller compactor working a dirt construction site\" width=\"1200\" height=\"800\" class=\"wp-image-5732\" data-img-slot=\"2\" loading=\"lazy\" srcset=\"https:\/\/www.relyirgrass.com\/wp-content\/uploads\/2026\/10\/build-own-tennis-court-backyard-step-by-step-slot2.webp 1200w, https:\/\/www.relyirgrass.com\/wp-content\/uploads\/2026\/10\/build-own-tennis-court-backyard-step-by-step-slot2-300x200.webp 300w, https:\/\/www.relyirgrass.com\/wp-content\/uploads\/2026\/10\/build-own-tennis-court-backyard-step-by-step-slot2-1024x683.webp 1024w, https:\/\/www.relyirgrass.com\/wp-content\/uploads\/2026\/10\/build-own-tennis-court-backyard-step-by-step-slot2-768x512.webp 768w, https:\/\/www.relyirgrass.com\/wp-content\/uploads\/2026\/10\/build-own-tennis-court-backyard-step-by-step-slot2-18x12.webp 18w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><figcaption>Compaction happens in passes, not one drive-over &#8211; a base that skips this step moves later.<\/figcaption><\/figure>\n<p>Slope is a feature rather than a flaw. Outdoor courts carry a built-in drainage gradient. Per Tennis Australia&#8217;s dimensions information sheet, it generally sits between 1% and 0.5%. The right figure hinges on whether the base drains vertically or sheds water across the surface. The gradient you need depends on the base type, which is the next decision.<\/p>\n<p>What sits beneath the turf is a stack of layers, each with a job to do. <a href=\"https:\/\/www.relyirgrass.com\/artificial-grass-tennis-courts-construction-features\/\">What each construction layer actually does<\/a> is laid out on the construction features page, and it is worth an hour before you order anything. Skipping that reading is how owners end up with a surface their base can never support.<\/p>\n<ul>\n<li><strong>Reinforced concrete.<\/strong> The most stable platform for a synthetic surface, and one of the two bases Tennis Australia prefers for holding surface tolerances across the base&#8217;s life.<\/li>\n<li><strong>Asphalt.<\/strong> The other preferred base, chosen for the same tolerance control and for easier resurfacing later.<\/li>\n<li><strong>Compacted earth or crushed rock.<\/strong> The lower-cost route, and one that sand-filled turf also accepts; an old porous clay court can serve as a base in the same way.<\/li>\n<\/ul>\n<p>Water is the part homeowners consistently underestimate. Stormwater run-off must be captured from the surface and its surrounds and directed away efficiently, because water invading the court edges or the underside is a common cause of damage. <a href=\"https:\/\/www.relyirgrass.com\/artificial-grass-drainage-bases\/\">How drainage bases are designed<\/a> is the subject of the drainage bases guide.<\/p>\n<h2 id=\"surface-day-rolling-out-seaming-line-marking-and-sand\">Surface Day: Rolling Out, Seaming, Line Marking and Sand<\/h2>\n<p>If you build backyard tennis court surfaces on artificial grass, surface day follows a fixed sequence. You roll out the turf and seam it. You mark the lines and then fill and brush in the sand. The order matters more than speed, because every step locks in the one before it.<\/p>\n<figure>\n<img decoding=\"async\" style=\"width:100%;height:auto;border-radius:8px\" src=\"https:\/\/www.relyirgrass.com\/wp-content\/uploads\/2026\/10\/build-own-tennis-court-backyard-step-by-step-slot3.webp\" alt=\"Top-down view of rolled artificial grass rolls lined up in rows\" width=\"1200\" height=\"312\" class=\"wp-image-5748\" data-img-slot=\"3\" loading=\"lazy\" srcset=\"https:\/\/www.relyirgrass.com\/wp-content\/uploads\/2026\/10\/build-own-tennis-court-backyard-step-by-step-slot3.webp 1200w, https:\/\/www.relyirgrass.com\/wp-content\/uploads\/2026\/10\/build-own-tennis-court-backyard-step-by-step-slot3-300x78.webp 300w, https:\/\/www.relyirgrass.com\/wp-content\/uploads\/2026\/10\/build-own-tennis-court-backyard-step-by-step-slot3-1024x266.webp 1024w, https:\/\/www.relyirgrass.com\/wp-content\/uploads\/2026\/10\/build-own-tennis-court-backyard-step-by-step-slot3-768x200.webp 768w, https:\/\/www.relyirgrass.com\/wp-content\/uploads\/2026\/10\/build-own-tennis-court-backyard-step-by-step-slot3-18x5.webp 18w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><figcaption>Site-width rolls staged in install order &#8211; surface day goes smoothly when the carpet arrives sequenced.<\/figcaption><\/figure>\n<h3>Rolling Out and Seaming<\/h3>\n<p>Rolls arrive in set widths, and the width you choose decides how many seams you will live with. Standard tennis turf comes in 2 m, 4 m and 5 m widths, each 25 m long. A 5 m roll crosses most of a court with almost no seams. Custom widths cut the seam count further, which matters because a seam landing mid-court becomes a permanent brushing lane.<\/p>\n<p>Lay every roll in the same direction so the pile leans one way across the whole court. Butt the edges tight before fixing the seams, because a gap or an overlap shows up later as a visible line where sand works loose. Fix each seam as you go so nothing shifts while you walk the court.<\/p>\n<h3>Line Marking<\/h3>\n<p>Lines on artificial grass follow their own logic. All lines share one colour and contrast with the surface, and every measurement is taken to the outside edge of the line, per the WA Government guide. Widths sit between 2.5 cm and 5 cm, with the baseline allowed up to 10 cm.<\/p>\n<p>Your marking options are throw-down rubber or thermoplastic strips, diluted chalk liquid, strong adhesive tape rated for up to six months, or semi-permanent paint. Pick a colour close to the turf colour so the markings do not distract from play. Rehearse the layout with string before anything permanent goes down.<\/p>\n<h3>Sand Infill and the First Brush<\/h3>\n<p>Sand-filled tennis turf takes washed tennis sand brushed deep into the pile. Tennis Victoria&#8217;s maintenance guide describes this arrangement for courts laid over concrete or asphalt. The turf side of that pairing is where <a href=\"https:\/\/www.relyirgrass.com\/tennis-court-artificial-grass-specifications\/\">sand-filled tennis turf specifications<\/a> earn their keep, because pile height and density decide how the ball sits and how the surface drains.<\/p>\n<p>Brush in stages rather than all at once. A first pass settles the sand, a second pass re-checks the seams, and the pile should stand close to upright when you finish. The first brush-in sets the surface character for the whole season, so it is not a job to rush at dusk.<\/p>\n<h2 id=\"acceptance-what-done-should-look-like\">Acceptance: What Done Should Look Like<\/h2>\n<p>Acceptance is the step that separates owners who build backyard tennis court systems that last from owners who inherit slow problems. A court is not finished when the last roll goes down. It is finished when it passes a checklist you wrote before surface day.<\/p>\n<h3>Seams<\/h3>\n<p>No gaps, no overlaps, and no height difference you can feel underfoot.<\/p>\n<h3>Lines<\/h3>\n<p>Straight, fully fixed, and measured to the outside edge as marked.<\/p>\n<h3>Sand<\/h3>\n<p>Brushed in evenly, pile upright, no bare patches where the backing shows.<\/p>\n<h3>Slope<\/h3>\n<p>Water leaves the court after rain, with no standing water anywhere.<\/p>\n<h3>Edges<\/h3>\n<p>Perimeter fixing holds against a firm sideways pull.<\/p>\n<p>The first month is an observation window rather than a holiday. Under-maintained artificial grass turns dirty quickly, grows weeds, moss and algae, and starts ponding, which is why the low corner after each rain is the place to watch. Early settling announces itself there first, while it is still cheap to correct.<\/p>\n<p>The last acceptance item is the match between turf and plan. We keep <a href=\"https:\/\/www.relyirgrass.com\/sports-artificial-grass\/tennis-turf\/\">tennis turf built to the project<\/a> as a standing option, so the rolls on site carry the pile height, density and roll width your base was planned around. If those three match your groundwork drawings, sign the build off.<\/p>\n<div class=\"cta-box\" style=\"background-color:#1a2b3c;border-radius:6px;padding:30px;margin:35px 0\">\n<h3 style=\"color:#ffffff;margin-top:0\">Specifying the Rolls for Your Build?<\/h3>\n<p style=\"color:#ffffff\">Tennis turf built to your site: pile height, density and roll width configurable, samples sent before you commit.<\/p>\n<p><a href=\"https:\/\/www.relyirgrass.com\/sports-artificial-grass\/tennis-turf\/\" style=\"display:inline-block;background-color:#1a5c2e;color:#ffffff;padding:12px 24px;border-radius:4px;text-decoration:none;font-weight:600\">View Tennis Turf<\/a><\/p>\n<\/div>\n<h2 id=\"the-mistakes-that-sink-first-time-builds\">The Mistakes That Sink First-Time Builds<\/h2>\n<p>Most of the failures we hear about come from first-timers who build backyard tennis court setups without a checklist. The pattern repeats across projects with almost no variation. Every item below was avoidable at planning stage, which is what makes the list worth reading twice.<\/p>\n<p>The classic sequence looks like this.<\/p>\n<h3>The Skipped Utility Call<\/h3>\n<p>The utility call gets skipped because the hole looks shallow.<\/p>\n<h3>The Graded-Flat Base<\/h3>\n<p>The base is graded flat because slope felt optional.<\/p>\n<h3>The Skipped Sand Infill<\/h3>\n<p>The sand infill gets skipped to save a weekend.<\/p>\n<h3>The Sacrificed Run-Off Space<\/h3>\n<p>The run-off space gets traded away to protect a garden bed.<\/p>\n<p>Each shortcut survives handover. Each one fails inside the first season.<\/p>\n<div class=\"callout callout-warning\">\n<p><strong>The flat-base trap.<\/strong> A base graded flat because slope felt optional announces itself as ponding after the first heavy rain. Correcting slope after the turf goes down means lifting the surface you just rolled out. Set the gradient in the subgrade, where the same correction costs an afternoon with a rake and a level.<\/p>\n<\/div>\n<h2 id=\"from-finished-court-to-first-serve\">From Finished Court to First Serve<\/h2>\n<p>The real payoff when you build backyard tennis court spaces yourself is not the money saved. It is that you witnessed every step, and that record makes every later repair and renewal traceable. You know the slope that was cut, the base that was laid and the sand that was brushed in.<\/p>\n<p>That record closes the loop this guide opened. The dig-stage decisions set the envelope and the orientation, and the groundwork set the slope and the base. Surface day set the seams and the lines, and acceptance set the standard your maintenance now has to hold. When something needs correcting later, you aim at the right layer because you know which layer did what.<\/p>\n<p>Base and drainage belong to your local crew, but the surface rolls are the component you can order factory-direct to your site. The rolls come configured for pile height, density, backing and roll width. Start with samples rather than a spec sheet, because a sample shows how the pile stands and how the ball sits before a whole order is committed. That is the same checklist habit this guide began with, applied to the last decision on the list.<\/p>\n<p><!-- relyirgate:C1 --><\/p>\n<h2 id=\"frequently-asked-questions\">Frequently Asked Questions<\/h2>\n<div class=\"faq-card\" style=\"background:#f9f9f9;border-left:4px solid #1a5c2e;border-radius:4px;padding:25px;margin-bottom:18px\">\n<h3 style=\"color:#1a5c2e;margin-top:0\">How much space do you need to build a backyard tennis court?<\/h3>\n<p>A club-level single court needs 34.77 m x 17.07 m in total including run-off, per the WA Government guide, or roughly 114 ft x 56 ft. Many backyards fit a scaled practice court instead by trimming the run-off.<\/p>\n<\/div>\n<div class=\"faq-card\" style=\"background:#f9f9f9;border-left:4px solid #1a5c2e;border-radius:4px;padding:25px;margin-bottom:18px\">\n<h3 style=\"color:#1a5c2e;margin-top:0\">Which way should a backyard tennis court face?<\/h3>\n<p>North-south is the optimum orientation because it keeps low sun out of players&#8217; eyes. If your plot will not allow it, weigh building shade, wind and tree cover instead. Avoid mixing north-south and east-west axes across one site.<\/p>\n<\/div>\n<div class=\"faq-card\" style=\"background:#f9f9f9;border-left:4px solid #1a5c2e;border-radius:4px;padding:25px;margin-bottom:18px\">\n<h3 style=\"color:#1a5c2e;margin-top:0\">Can you lay artificial grass tennis turf yourself?<\/h3>\n<p>Yes, on the turf side: rolls are unrolled, seamed, marked and sand-filled by competent DIYers. The base and drainage are the stage where most owners bring in a local crew. Get the base right and the surface work follows.<\/p>\n<\/div>\n<div class=\"faq-card\" style=\"background:#f9f9f9;border-left:4px solid #1a5c2e;border-radius:4px;padding:25px;margin-bottom:18px\">\n<h3 style=\"color:#1a5c2e;margin-top:0\">How are lines marked on artificial grass?<\/h3>\n<p>Options are throw-down strips, diluted chalk liquid, strong tape rated up to six months, or semi-permanent paint. Lime is not suitable for artificial grass. Choose a line colour close to the surface colour and measure to the lines&#8217; outside edges.<\/p>\n<\/div>\n<div class=\"faq-card\" style=\"background:#f9f9f9;border-left:4px solid #1a5c2e;border-radius:4px;padding:25px;margin-bottom:18px\">\n<h3 style=\"color:#1a5c2e;margin-top:0\">What should I check before digging?<\/h3>\n<p>Check the space envelope, the orientation and the underground utilities first. Dial 811 in the US before any excavation; the call and the utility marking are free, and state law requires 48 to 72 hours notice.<\/p>\n<\/div>\n<p><script type=\"application\/ld+json\">\n{\n \"@context\": \"https:\/\/schema.org\",\n \"@type\": \"Article\",\n \"headline\": \"Build Your Own Tennis Court for Backyard: A Step-by-Step Guide\",\n \"description\": \"The backyard tennis court build sequence: decisions, groundwork, surface day, acceptance checklist and the mistakes that sink first-time builds.\",\n \"author\": {\"@type\": \"Organization\", \"name\": \"Relyir Artificial Grass\"},\n \"publisher\": {\"@type\": \"Organization\", \"name\": \"Relyir Artificial Grass\"},\n \"datePublished\": \"2026-10-12\",\n \"dateModified\": \"2026-10-12\",\n \"mainEntityOfPage\": \"https:\/\/www.relyirgrass.com\/build-own-tennis-court-backyard-step-by-step\/\"\n}<\/script><\/p>\n<p><script type=\"application\/ld+json\">\n{\"@context\": \"https:\/\/schema.org\", \"@type\": \"FAQPage\", \"mainEntity\": [{\"@type\": \"Question\", \"name\": \"How much space do you need to build a backyard tennis court?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"A club-level single court needs 34.77 m x 17.07 m in total including run-off, per the WA Government guide, or roughly 114 ft x 56 ft. Many backyards fit a scaled practice court instead by trimming the run-off.\"}}, {\"@type\": \"Question\", \"name\": \"Which way should a backyard tennis court face?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"North-south is the optimum orientation because it keeps low sun out of players' eyes. If your plot will not allow it, weigh building shade, wind and tree cover instead. Avoid mixing north-south and east-west axes across one site.\"}}, {\"@type\": \"Question\", \"name\": \"Can you lay artificial grass tennis turf yourself?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"Yes, on the turf side: rolls are unrolled, seamed, marked and sand-filled by competent DIYers. The base and drainage are the stage where most owners bring in a local crew. Get the base right and the surface work follows.\"}}, {\"@type\": \"Question\", \"name\": \"How are lines marked on artificial grass?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"Options are throw-down strips, diluted chalk liquid, strong tape rated up to six months, or semi-permanent paint. Lime is not suitable for artificial grass. Choose a line colour close to the surface colour and measure to the lines' outside edges.\"}}, {\"@type\": \"Question\", \"name\": \"What should I check before digging?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"Check the space envelope, the orientation and the underground utilities first. Dial 811 in the US before any excavation; the call and the utility marking are free, and state law requires 48 to 72 hours notice.\"}}]}<\/script><\/p>\n<p><script type=\"application\/ld+json\">\n{\n \"@context\": \"https:\/\/schema.org\",\n \"definition\": \"Building a backyard tennis court runs as a sequence of verifiable gates: four pre-dig decisions (space envelope, orientation, permits, utility clearance), a groundwork stage that sets site prep, drainage slope and base type, a surface day of rolling out, seaming, line marking and sand infill, and an acceptance checklist plus a first-month observation window that ends in a signed-off build.\",\n \"key_facts\": [\n  \"Per the ITF Rules of Tennis, a singles court measures 78 ft (23.77 m) long and 27 ft (8.23 m) wide, with the doubles court 36 ft (10.97 m) wide\",\n  \"Per the WA Government sports dimensions guide, a club-level single court needs 34.77 m x 17.07 m in total including run-off, with 5.48 m behind each baseline and 3.05 m along the sides\",\n  \"Per Tennis Australia's dimensions information sheet, outdoor courts carry a built-in drainage gradient, generally between 1% and 0.5% depending on whether the base drains vertically or sheds water across the surface\",\n  \"Per PHMSA call-before-you-dig guidance, dial 811 anywhere in the US before excavation; every state runs a one-call centre, state law requires 48 to 72 hours notice, and the call and utility marking are free\",\n  \"Per the WA Government guide, artificial grass line marking options are throw-down strips, diluted chalk, strong tape up to six months and semi-permanent paint; lime is not suitable, and line widths sit between 2.5 cm and 5 cm with the baseline up to 10 cm\"\n ],\n \"qa_concise\": [\n  {\"q\": \"How much space do you need to build a backyard tennis court?\", \"a\": \"A club-level single court needs 34.77 m x 17.07 m in total including run-off, per the WA Government guide, or roughly 114 ft x 56 ft; many backyards fit a scaled practice court instead.\"},\n  {\"q\": \"Can you lay artificial grass tennis turf yourself?\", \"a\": \"Yes on the turf side: rolls are unrolled, seamed, marked and sand-filled by competent DIYers, while the base and drainage are where most owners bring in a local crew.\"},\n  {\"q\": \"What should I check before digging?\", \"a\": \"Check the space envelope, the orientation and the underground utilities, and dial 811 in the US before any excavation since the call and marking are free.\"}\n ]\n}<\/script><\/p>\n","protected":false},"excerpt":{"rendered":"<p>\u0645\u0639\u0638\u0645 \u0627\u0644\u062f\u0644\u0627\u0626\u0644 \u062a\u062e\u062a\u0632\u0644 \u0628\u0646\u0627\u0621 \u0645\u0644\u0639\u0628 \u062a\u0646\u0633 \u0641\u064a \u0627\u0644\u0641\u0646\u0627\u0621 \u0627\u0644\u062e\u0644\u0641\u064a \u0625\u0644\u0649 \u0639\u0637\u0644\u0629 \u0646\u0647\u0627\u064a\u0629 \u0623\u0633\u0628\u0648\u0639 \u0648\u0627\u062d\u062f\u0629 \u0648\u062f\u0648\u0651\u0627\u0633\u0629 \u0645\u0624\u062c\u0651\u0631\u0629. \u0623\u0645\u0627 \u0623\u0635\u062d\u0627\u0628 \u0627\u0644\u062d\u062f\u0627\u0626\u0642 \u0627\u0644\u0630\u064a\u0646 \u064a\u0628\u0630\u0644\u0648\u0646 \u0623\u0633\u0637\u062d \u0645\u0644\u0627\u0639\u0628 \u0627\u0644\u062a\u0646\u0633 \u0628\u0623\u0646\u0641\u0633\u0647\u0645 \u0641\u064a \u0633\u0627\u062d\u0627\u062a\u0647\u0645 \u0627\u0644\u062e\u0627\u0635\u0629 \u0641\u064a\u0635\u0641\u0648\u0646 \u0634\u064a\u0626\u0627\u064b \u0622\u062e\u0631. \u0648\u0642\u0628\u0644 \u0648\u0636\u0639 \u0627\u0644\u0623\u0633\u0627\u0633 \u0628\u0648\u0642\u062a \u0637\u0648\u064a\u0644\u060c \u064a\u0648\u0627\u062c\u0647\u0648\u0646 \u0625\u0632\u0627\u0644\u0629 \u062c\u0630\u0648\u0631 \u0627\u0644\u0623\u0634\u062c\u0627\u0631 \u0648\u0625\u0639\u0627\u062f\u0629 \u0627\u0644\u062a\u0633\u0648\u064a\u0629 \u0627\u0644\u062a\u064a \u0644\u0627 \u062a\u0646\u062a\u0647\u064a. \u0648\u062a\u064f\u0631\u0633\u064e\u0645 \u062a\u0635\u0627\u0645\u064a\u0645\u0647\u0645 \u0639\u0644\u0649 \u0645\u0633\u0627\u062d\u0627\u062a \u062a\u062a\u0628\u064a\u0651\u0646 \u0644\u0627\u062d\u0642\u0627\u064b \u0628\u0623\u0646\u0647\u0627 \u0636\u064a\u0651\u0642\u0629 \u062c\u062f\u0651\u0627\u064b \u0644\u0644\u062a\u0635\u0631\u064a\u0641 \u0627\u0644\u0641\u0639\u0644\u064a \u0644\u0644\u0645\u064a\u0627\u0647. \u2026 <a title=\"\u0645\u0627 \u064a\u0644\u0632\u0645 \u0644\u0628\u0646\u0627\u0621 \u0645\u0644\u0639\u0628 \u062a\u0646\u0633 \u062e\u0644\u0641\u064a\" class=\"read-more\" href=\"https:\/\/www.relyirgrass.com\/ar\/build-own-tennis-court-backyard-step-by-step\/\" aria-label=\"Read more about What It Takes to Build a Backyard Tennis Court\">\u0627\u0642\u0631\u0623 \u0627\u0644\u0645\u0632\u064a\u062f<\/a><\/p>","protected":false},"author":2,"featured_media":5730,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"rank_math_title":"Build Your Own Tennis Court for Backyard: Step-by-Step","rank_math_description":"The backyard tennis court build sequence: decisions, groundwork, surface day, acceptance checklist and the mistakes that sink first-time builds.","rank_math_focus_keyword":"build backyard tennis court","rank_math_robots":"","rank_math_canonical_url":"","rank_math_facebook_title":"","rank_math_facebook_description":"","rank_math_twitter_title":"","rank_math_twitter_description":"","_yoast_wpseo_title":"","_yoast_wpseo_metadesc":"","_yoast_wpseo_focuskw":"","_yoast_wpseo_canonical":"","_yoast_wpseo_meta-robots-noindex":"","_yoast_wpseo_meta-robots-nofollow":"","_yoast_wpseo_opengraph-title":"","_yoast_wpseo_opengraph-description":"","_yoast_wpseo_twitter-title":"","_yoast_wpseo_twitter-description":"","_aioseo_title":"","_aioseo_description":"","_aioseo_keywords":"","_aioseo_robots_default":"","_aioseo_robots_noindex":"","_aioseo_og_title":"","_aioseo_og_description":"","_aioseo_twitter_title":"","_aioseo_twitter_description":"","aiosp_title":"","aiosp_description":"","aiosp_keywords":"","_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_analysis_target_kw":"","_seopress_robots_canonical":"","_seopress_robots_index":"","_seopress_robots_follow":"","_seopress_social_fb_title":"","_seopress_social_fb_desc":"","_seopress_social_twitter_title":"","_seopress_social_twitter_desc":"","_genesis_title":"","_genesis_description":"","_genesis_canonical":"","_genesis_noindex":"","_genesis_nofollow":"","slim_seo":"","footnotes":""},"categories":[28],"tags":[],"class_list":["post-5753","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-sports-field-turf"],"_links":{"self":[{"href":"https:\/\/www.relyirgrass.com\/ar\/wp-json\/wp\/v2\/posts\/5753","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.relyirgrass.com\/ar\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.relyirgrass.com\/ar\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.relyirgrass.com\/ar\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.relyirgrass.com\/ar\/wp-json\/wp\/v2\/comments?post=5753"}],"version-history":[{"count":1,"href":"https:\/\/www.relyirgrass.com\/ar\/wp-json\/wp\/v2\/posts\/5753\/revisions"}],"predecessor-version":[{"id":6706,"href":"https:\/\/www.relyirgrass.com\/ar\/wp-json\/wp\/v2\/posts\/5753\/revisions\/6706"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.relyirgrass.com\/ar\/wp-json\/wp\/v2\/media\/5730"}],"wp:attachment":[{"href":"https:\/\/www.relyirgrass.com\/ar\/wp-json\/wp\/v2\/media?parent=5753"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.relyirgrass.com\/ar\/wp-json\/wp\/v2\/categories?post=5753"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.relyirgrass.com\/ar\/wp-json\/wp\/v2\/tags?post=5753"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}