{"id":2796,"date":"2026-07-31T17:52:57","date_gmt":"2026-07-31T17:52:57","guid":{"rendered":"https:\/\/www.relyirgrass.com\/prepare-for-your-artificial-turf-installation\/"},"modified":"2026-09-19T02:30:12","modified_gmt":"2026-09-19T02:30:12","slug":"prepare-for-your-artificial-turf-installation","status":"publish","type":"post","link":"https:\/\/www.relyirgrass.com\/de\/prepare-for-your-artificial-turf-installation\/","title":{"rendered":"So bereiten Sie sich auf Ihre Kunstrasen-Installation vor"},"content":{"rendered":"<style>\nh2 { font-size: 1.6em; line-height: 1.3; margin: 40px 0 18px; }\nh3 { font-size: 1.2em; line-height: 1.35; margin: 26px 0 12px; }\np { line-height: 1.8; margin-bottom: 28px; }\nul { margin-bottom: 28px; padding-left: 20px; list-style-type: disc; }\nli { margin-bottom: 10px; line-height: 1.6; }\ntable { display: table !important; width: 100% !important; border-collapse: collapse; margin-bottom: 28px; }\nth { text-align: left; padding: 12px 14px; background: #1a5c2e; color: #ffffff; font-weight: 600; }\ntd { padding: 12px 14px; border-bottom: 1px solid #e5e5e5; vertical-align: top; }\nfigcaption { text-align: center; font-style: italic; }\n<\/style>\n<p><!-- meta_title: How to Prepare for Your Artificial Turf Installation --><br \/>\n<!-- meta_description: A contractor's checklist for artificial grass site preparation: measurements, clearing, drainage fall, base depth, compaction and delivery-day staging. --><\/p>\n<p>A poor base never announces itself on day one. The turf looks flawless at handover, and the first heavy rain finds every flat spot. By the second season, seams stand proud of dips that no brush can fix.<\/p>\n<p>Knowing how to prepare for your artificial turf installation means turning each step into something you can check rather than hope for. We manufacture artificial grass rolls on our own line, and the questions contractors raise with us are practical ones: measurement, clearing, fall, base and compaction. Each stage here carries a requirement plus an acceptance standard you can walk out and verify.<\/p>\n<h2 id=\"why-site-preparation-decides-the-whole-installation\">Why Site Preparation Decides the Whole Installation<\/h2>\n<p>Site work is the least photogenic part of a project and the one that decides whether the surface performs. Water that cannot escape softens the base and lets it settle. Organic matter left under the carpet decomposes and leaves voids. A base that was never compacted properly keeps sinking under foot traffic and equipment. None of these show on installation day, and all of them show within the first year of use.<\/p>\n<p>Contractors who treat preparation as a footnote on the quote pay for it later in re-grades and seam repairs. Preparation is where artificial turf installations are won, so the steps below run in the order the work happens on site. Review the <a href=\"https:\/\/www.relyirgrass.com\/residential-artificial-grass\/\">residential artificial grass range<\/a> early as well, because pile height and backing choices influence how the base should finish.<\/p>\n<h2 id=\"measure-and-map-the-site-before-anything-arrives\">Measure and Map the Site Before Anything Arrives<\/h2>\n<p>Every plan for how to prepare for your artificial turf installation starts with a tape and a notepad. Measure the length and width of the full area, including curves, and sketch obstacle positions such as trees, beds and steps. Set stakes and run string along the outline so the boundaries are visible to everyone on site. Note access gates, slopes and where a delivery vehicle can unload.<\/p>\n<div class=\"wp-block-image\">\n<figure><img decoding=\"async\" src=\"https:\/\/www.relyirgrass.com\/wp-content\/uploads\/2026\/09\/artificial-grass-backyard-installation-workers-sand-infill.jpg\" alt=\"Active residential installation showing contractors distributing and brushing silica sand infill across newly laid artificial grass yard\" class=\"wp-image-2611\" width=\"1120\" height=\"680\" loading=\"lazy\" srcset=\"https:\/\/www.relyirgrass.com\/wp-content\/uploads\/2026\/09\/artificial-grass-backyard-installation-workers-sand-infill.jpg 1120w, https:\/\/www.relyirgrass.com\/wp-content\/uploads\/2026\/09\/artificial-grass-backyard-installation-workers-sand-infill-300x182.jpg 300w, https:\/\/www.relyirgrass.com\/wp-content\/uploads\/2026\/09\/artificial-grass-backyard-installation-workers-sand-infill-1024x622.jpg 1024w, https:\/\/www.relyirgrass.com\/wp-content\/uploads\/2026\/09\/artificial-grass-backyard-installation-workers-sand-infill-768x466.jpg 768w, https:\/\/www.relyirgrass.com\/wp-content\/uploads\/2026\/09\/artificial-grass-backyard-installation-workers-sand-infill-18x12.jpg 18w\" sizes=\"auto, (max-width: 1120px) 100vw, 1120px\" \/><figcaption>Stakes and string marking the boundary of a lawn area<\/figcaption><\/figure>\n<\/div>\n<p>Accurate dimensions do two jobs. They size the roll count, and they expose awkward shapes early, while changing the plan is still cheap on paper. Record every measurement in metres and keep one person accountable for the numbers.<\/p>\n<h2 id=\"clear-the-ground-of-vegetation-and-debris\">Clear the Ground of Vegetation and Debris<\/h2>\n<p>Remove existing grass, weeds, plants and roots from the marked area, digging below the surface so nothing organic is left to regrow. Material left behind decomposes, creates uneven spots and invites weeds up through the new surface. Rake the cleared ground to lift rocks, sticks and builders debris.<\/p>\n<div class=\"wp-block-image\">\n<figure><img decoding=\"async\" src=\"https:\/\/www.relyirgrass.com\/wp-content\/uploads\/2026\/09\/artificial-grass-installation-prep-body-4.webp\" alt=\"Close-up of a foot on a shovel digging into soil\" class=\"wp-image-803\" width=\"1200\" height=\"800\" loading=\"lazy\" srcset=\"https:\/\/www.relyirgrass.com\/wp-content\/uploads\/2026\/09\/artificial-grass-installation-prep-body-4.webp 1200w, https:\/\/www.relyirgrass.com\/wp-content\/uploads\/2026\/09\/artificial-grass-installation-prep-body-4-300x200.webp 300w, https:\/\/www.relyirgrass.com\/wp-content\/uploads\/2026\/09\/artificial-grass-installation-prep-body-4-1024x683.webp 1024w, https:\/\/www.relyirgrass.com\/wp-content\/uploads\/2026\/09\/artificial-grass-installation-prep-body-4-768x512.webp 768w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><figcaption>Cleared bare soil with a shovel at the edge of the work area<\/figcaption><\/figure>\n<\/div>\n<p>Excavate roughly 3 to 4 inches of soil across the area to make room for the base layers. The acceptance standard here is simple: a clean mineral surface with no visible roots, no organic pockets and no debris.<\/p>\n<h2 id=\"set-the-grading-and-drainage-fall-correctly\">Set the Grading and Drainage Fall Correctly<\/h2>\n<p>Water is the patient enemy of a turf system, and grading is how you answer it. Shape the subsoil so the finished area carries a fall of roughly 1 to 2 percent away from buildings and paved edges. On a ten-metre run that is a modest drop, yet it decides whether rain leaves the surface or sits on it.<\/p>\n<p>Where soil retains water or rainfall is heavy, plan sub-drainage such as French drains or perforated pipe to carry water away. The acceptance check is a hose test: water applied anywhere on the graded subsoil should move toward the outlet and never pool.<\/p>\n<h2 id=\"choose-and-compact-the-base-layer-properly\">Choose and Compact the Base Layer Properly<\/h2>\n<p>Base selection is the last technical decision in how to prepare for your artificial turf installation, and material matters more than brand loyalty. Crushed aggregate in the Class II road base family compacts tightly while still letting water pass, which makes it the default for most installations. Decomposed granite suits dry regions, where its clean, tight compaction is an advantage. Spread the base 2 to 4 inches deep, or 3 to 4 inches where ground movement is a concern.<\/p>\n<div class=\"wp-block-image\">\n<figure><img decoding=\"async\" src=\"https:\/\/www.relyirgrass.com\/wp-content\/uploads\/2026\/09\/artificial-grass-gloved-hands-unrolling-turf-roll.jpg\" alt=\"Close-up of construction worker wearing yellow protective work gloves rolling out a brand new architectural synthetic lawn carpet\" class=\"wp-image-2658\" width=\"1120\" height=\"680\" loading=\"lazy\" srcset=\"https:\/\/www.relyirgrass.com\/wp-content\/uploads\/2026\/09\/artificial-grass-gloved-hands-unrolling-turf-roll.jpg 1120w, https:\/\/www.relyirgrass.com\/wp-content\/uploads\/2026\/09\/artificial-grass-gloved-hands-unrolling-turf-roll-300x182.jpg 300w, https:\/\/www.relyirgrass.com\/wp-content\/uploads\/2026\/09\/artificial-grass-gloved-hands-unrolling-turf-roll-1024x622.jpg 1024w, https:\/\/www.relyirgrass.com\/wp-content\/uploads\/2026\/09\/artificial-grass-gloved-hands-unrolling-turf-roll-768x466.jpg 768w, https:\/\/www.relyirgrass.com\/wp-content\/uploads\/2026\/09\/artificial-grass-gloved-hands-unrolling-turf-roll-18x12.jpg 18w\" sizes=\"auto, (max-width: 1120px) 100vw, 1120px\" \/><figcaption>Close-up of construction worker wearing yellow protective work gloves rolling out a brand new architectural synthetic lawn carpet.<\/figcaption><\/figure>\n<\/div>\n<p>Compact with a vibratory plate compactor in multiple passes, wetting the material lightly so voids close. The finished base should feel firm underfoot, take a loaded wheelbarrow without rutting, and hold the fall you graded. The table below compares the common choices.<\/p>\n<table>\n<thead>\n<tr>\n<th>Base material<\/th>\n<th>Where it performs best<\/th>\n<th>Why crews choose it<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Class II road base \/ crushed aggregate<\/td>\n<td>Most residential and commercial installs<\/td>\n<td>Compacts tightly while water still passes<\/td>\n<\/tr>\n<tr>\n<td>Decomposed granite<\/td>\n<td>Dry regions<\/td>\n<td>Compacts well with a clean finish<\/td>\n<\/tr>\n<tr>\n<td>Crushed stone or gravel<\/td>\n<td>General stability layer<\/td>\n<td>Common at a 2 to 4 inch depth<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2 id=\"preparation-mistakes-that-ruin-artificial-turf-installations\">Preparation Mistakes That Ruin Artificial Turf Installations<\/h2>\n<p>Most failures in how to prepare for your artificial turf installation trace back to a handful of repeat habits. Each one below has a cheap fix at preparation stage and an expensive fix afterwards.<\/p>\n<h3>Skipping Utility Marking Before You Dig<\/h3>\n<p>Every underground service line must be marked before excavation starts. A digger through a cable or pipe costs far more than the marking visit ever will.<\/p>\n<h3>Burying Organic Material Under the Base<\/h3>\n<p>Roots and turf left in place decompose and hollow the ground from below. Strip them out rather than turning them under, because the voids they leave become dips.<\/p>\n<h3>Flattening the Site Instead of Grading It<\/h3>\n<p>A level pad is not the goal; a graded one is. Without fall, water pools on the surface and softens the base beneath it.<\/p>\n<h3>Under-Compacting the Base Layer<\/h3>\n<p>Loose base settles under traffic and drags the surface down with it. Compact in multiple passes with a plate compactor until the finish resists a boot heel.<\/p>\n<h2 id=\"your-pre-installation-checklist-before-the-rolls-arrive\">Your Pre-Installation Checklist Before the Rolls Arrive<\/h2>\n<p>Run this sequence in order and knowing how to prepare for your artificial turf installation becomes a page you can initial rather than a memory test.<\/p>\n<h3>Confirm Measurements Against the Final Layout<\/h3>\n<p>Walk the string line with the sketch in hand and re-read every dimension. Discrepancies cost nothing on paper and everything in roll count.<\/p>\n<h3>Mark Utilities and Plan the Access Route<\/h3>\n<p>Have every underground service marked and keep the markings visible until digging is done. Confirm gate width and turning room for the delivery vehicle.<\/p>\n<h3>Clear Vegetation and Strip 3 to 4 Inches of Soil<\/h3>\n<p>The acceptance standard is a mineral surface: no roots, no organic pockets, no debris. Excavation depth should leave room for a 2 to 4 inch base.<\/p>\n<h3>Verify the 1 to 2 Percent Fall<\/h3>\n<p>Check the grade with a level and string line across the fall direction. Run the hose test and confirm water exits the area without pooling.<\/p>\n<h3>Compact and Proof the Base<\/h3>\n<p>Multiple plate compactor passes, lightly wetted, until the surface is firm. A heel press should leave no deep imprint, and a 10 to 15 mm sharp-sand finishing layer is optional for fine levelling.<\/p>\n<h3>Stage the Site for the Rolls<\/h3>\n<p>Decide where rolls will unroll, which way the grain should run, and where tools will sit. Clear the route from the unloading point to the final position.<\/p>\n<div class=\"cta-box\" style=\"background-color:#1a2b3c;border-radius:6px;padding:30px;margin:35px 0;\">\n<h3 style=\"color:#ffffff;margin-top:0;\">Can a Rushed Base Survive the First Season?<\/h3>\n<p style=\"color:#ffffff;\">Rushed preparation returns as pooling, dips and call-backs. Send measurements and intended use; we match pile height, backing and roll width. Pricing, typically 30\u201350% below market on like-for-like specifications.<\/p>\n<p><a href=\"https:\/\/www.relyirgrass.com\/artificial-grass-products\/artificial-grass-roll\/\" style=\"display:inline-block;background-color:#1a5c2e;color:#ffffff;padding:12px 24px;border-radius:4px;text-decoration:none;font-weight:600;\">See Turf Roll Specs<\/a><\/p>\n<\/div>\n<h2 id=\"matching-the-roll-specification-to-the-site\">Matching the Roll Specification to the Site<\/h2>\n<p>Preparation ends with a specification decision, and it should be driven by the site you just measured. Roll width sets seam count, because wider rolls cross big areas with fewer joins. Pile height, density and backing then follow from the use case, from light decorative cover to play areas under constant traffic.<\/p>\n<table>\n<thead>\n<tr>\n<th>Roll width<\/th>\n<th>Best fit<\/th>\n<th>Seam behaviour<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>2 m x 25 m<\/td>\n<td>Small areas, tight access, budget-led projects<\/td>\n<td>Most economical; more joins on wide spans<\/td>\n<\/tr>\n<tr>\n<td>4 m x 25 m<\/td>\n<td>Uncertain final dimensions; covers most layouts<\/td>\n<td>Fewer joins than 2 m; widest availability<\/td>\n<\/tr>\n<tr>\n<td>5 m x 25 m<\/td>\n<td>Large open areas such as sports surfaces<\/td>\n<td>Almost seam-free; heavier to handle<\/td>\n<\/tr>\n<tr>\n<td>Custom width<\/td>\n<td>Irregular shapes and premium layouts<\/td>\n<td>Made to the layout with no seams<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<div class=\"wp-block-image\">\n<figure><img decoding=\"async\" src=\"https:\/\/www.relyirgrass.com\/wp-content\/uploads\/2026\/09\/artificial-grass-gravel-base-installation-cross-section.jpg\" alt=\"Engineering cross-section profile demonstrating proper synthetic lawn installation over crushed gravel drainage aggregate and leveling base\" class=\"wp-image-2662\" width=\"1120\" height=\"680\" loading=\"lazy\" srcset=\"https:\/\/www.relyirgrass.com\/wp-content\/uploads\/2026\/09\/artificial-grass-gravel-base-installation-cross-section.jpg 1120w, https:\/\/www.relyirgrass.com\/wp-content\/uploads\/2026\/09\/artificial-grass-gravel-base-installation-cross-section-300x182.jpg 300w, https:\/\/www.relyirgrass.com\/wp-content\/uploads\/2026\/09\/artificial-grass-gravel-base-installation-cross-section-1024x622.jpg 1024w, https:\/\/www.relyirgrass.com\/wp-content\/uploads\/2026\/09\/artificial-grass-gravel-base-installation-cross-section-768x466.jpg 768w, https:\/\/www.relyirgrass.com\/wp-content\/uploads\/2026\/09\/artificial-grass-gravel-base-installation-cross-section-18x12.jpg 18w\" sizes=\"auto, (max-width: 1120px) 100vw, 1120px\" \/><figcaption>Rolls of green artificial grass standing in a row<\/figcaption><\/figure>\n<\/div>\n<p>Write the chosen width, pile height, density and backing into the site file before you order, so the ground works and the material spec move together. Our team produces rolls against a stated brief through our <a href=\"https:\/\/www.relyirgrass.com\/customization\/\">custom specification service<\/a>, and the <a href=\"https:\/\/www.relyirgrass.com\/artificial-grass-products\/artificial-grass-roll\/\">standard roll formats<\/a> cover most residential layouts.<\/p>\n<h2 id=\"receiving-and-staging-the-rolls-on-delivery-day\">Receiving and Staging the Rolls on Delivery Day<\/h2>\n<p>Rolls should be laid flat and given time to acclimate to site temperature before they are fixed, which relaxes transport curls and keeps the finish smooth. Plan the unroll direction so the grain runs the same way across every roll on site; mismatched grain shows as shade bands.<\/p>\n<p>Check the spec on arrival against your site file and confirm pile direction before the first roll leaves the ground. If material is still under review, a <a href=\"https:\/\/www.relyirgrass.com\/free-samples\/\">free sample set<\/a> settles the questions at a bench instead of on site.<\/p>\n<p>Working through how to prepare for your artificial turf installation step by step protects everything you spend on the surface itself. The ground does the quiet work for the next decade, so give it the days the site asks for.<\/p>\n<p><!-- relyirgate:C1 --><\/p>\n<h2 id=\"frequently-asked-questions\">Frequently Asked Questions<\/h2>\n<div class=\"faq-card\" style=\"background:#f9f9f9;border-left:4px solid #1a5c2e;border-radius:4px;padding:25px;margin-bottom:18px;\">\n<h3 style=\"color:#1a5c2e;margin-top:0;\">How far ahead should preparation start before the rolls arrive?<\/h3>\n<p>Start as soon as the layout is final. Ground preparation runs from a few hours to several days, depending on area size, access and existing conditions.<\/p>\n<\/div>\n<div class=\"faq-card\" style=\"background:#f9f9f9;border-left:4px solid #1a5c2e;border-radius:4px;padding:25px;margin-bottom:18px;\">\n<h3 style=\"color:#1a5c2e;margin-top:0;\">What slope should the finished base have?<\/h3>\n<p>Aim for a fall of roughly 1 to 2 percent away from buildings and hard edges. Water should always exit the surface rather than pool on it.<\/p>\n<\/div>\n<div class=\"faq-card\" style=\"background:#f9f9f9;border-left:4px solid #1a5c2e;border-radius:4px;padding:25px;margin-bottom:18px;\">\n<h3 style=\"color:#1a5c2e;margin-top:0;\">How deep should the base layer be?<\/h3>\n<p>Plan on a base layer 2 to 4 inches deep, with 3 to 4 inches recommended where shifting is a concern. Excavate about 3 to 4 inches of soil first.<\/p>\n<\/div>\n<div class=\"faq-card\" style=\"background:#f9f9f9;border-left:4px solid #1a5c2e;border-radius:4px;padding:25px;margin-bottom:18px;\">\n<h3 style=\"color:#1a5c2e;margin-top:0;\">Do you need a weed barrier under artificial grass?<\/h3>\n<p>Yes, a quality weed membrane or geotextile layer stops growth pushing up through the surface. It also helps water filter evenly into the base below.<\/p>\n<\/div>\n<div class=\"faq-card\" style=\"background:#f9f9f9;border-left:4px solid #1a5c2e;border-radius:4px;padding:25px;margin-bottom:18px;\">\n<h3 style=\"color:#1a5c2e;margin-top:0;\">Can turf be laid straight after compaction?<\/h3>\n<p>Lay the rolls flat and let them acclimate to site temperature first. This relaxes transport curls and prevents wrinkles from locking into the finished surface.<\/p>\n<\/div>\n<div class=\"faq-card\" style=\"background:#f9f9f9;border-left:4px solid #1a5c2e;border-radius:4px;padding:25px;margin-bottom:18px;\">\n<h3 style=\"color:#1a5c2e;margin-top:0;\">Which roll widths suit residential projects?<\/h3>\n<p>Rolls come in 2, 4 and 5 metre widths at 25 metres long, with custom widths available. Two metres suits small areas; four metres covers most layouts.<\/p>\n<\/div>\n<p><script type=\"application\/ld+json\">\n{\"@context\":\"https:\/\/schema.org\",\"@type\":\"Article\",\"headline\":\"How to Prepare for Your Artificial Turf Installation\",\"description\":\"A contractor's checklist for artificial grass site preparation: measurements, clearing, drainage fall, base depth, compaction and delivery-day staging.\",\"author\":{\"@type\":\"Organization\",\"name\":\"Relyir Artificial Grass\"},\"publisher\":{\"@type\":\"Organization\",\"name\":\"Relyir Artificial Grass\"},\"datePublished\":\"2026-09-16\",\"dateModified\":\"2026-09-16\",\"mainEntityOfPage\":\"https:\/\/www.relyirgrass.com\/prepare-for-your-artificial-turf-installation\/\"}\n<\/script><br \/>\n<script type=\"application\/ld+json\">\n{\"@context\":\"https:\/\/schema.org\",\"@type\":\"FAQPage\",\"mainEntity\":[{\"@type\":\"Question\",\"name\":\"How far ahead should preparation start before the rolls arrive?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Start as soon as the layout is final. Ground preparation runs from a few hours to several days, depending on area size, access and existing conditions.\"}},{\"@type\":\"Question\",\"name\":\"What slope should the finished base have?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Aim for a fall of roughly 1 to 2 percent away from buildings and hard edges. Water should always exit the surface rather than pool on it.\"}},{\"@type\":\"Question\",\"name\":\"How deep should the base layer be?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Plan on a base layer 2 to 4 inches deep, with 3 to 4 inches recommended where shifting is a concern. Excavate about 3 to 4 inches of soil first.\"}},{\"@type\":\"Question\",\"name\":\"Do you need a weed barrier under artificial grass?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Yes, a quality weed membrane or geotextile layer stops growth pushing up through the surface. It also helps water filter evenly into the base below.\"}},{\"@type\":\"Question\",\"name\":\"Can turf be laid straight after compaction?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Lay the rolls flat and let them acclimate to site temperature first. This relaxes transport curls and prevents wrinkles from locking into the finished surface.\"}},{\"@type\":\"Question\",\"name\":\"Which roll widths suit residential projects?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Rolls come in 2, 4 and 5 metre widths at 25 metres long, with custom widths available. Two metres suits small areas; four metres covers most layouts.\"}}]}\n<\/script><br \/>\n<script type=\"application\/ld+json\" id=\"evo301-geo-ai-block\">\n{\"definition\":\"Preparing a site for artificial grass means measuring and marking the layout, stripping vegetation and 3 to 4 inches of topsoil, grading a 1 to 2 percent fall away from structures, building a 2 to 4 inch compacted aggregate base, and matching roll width, pile height and backing to the measured site before delivery.\",\"data_statements\":[\"The ideal grading slope for artificial turf is typically about 1 to 2 percent away from structures to avoid pooling water.\",\"Ground preparation for artificial turf commonly starts with excavating 3 to 4 inches of soil to make room for the base layers.\",\"A base layer of 2 to 4 inches of crushed stone, gravel or decomposed granite provides stability and drainage; 3 to 4 inches is recommended where shifting is a concern.\",\"Class II road base is cited as the best all-around sub-base because it compacts tightly while allowing water flow, and decomposed granite suits dry regions.\",\"Compaction uses a vibratory plate compactor in multiple passes, with light wetting to close voids; an optional sharp-sand finishing layer of about 10 to 15 mm fine-tunes the level.\",\"Artificial grass rolls come in 2 m, 4 m and 5 m widths at 25 m long, with custom seam-free widths available; backing options are PP+Net and PU.\",\"Free 20 cm x 20 cm samples, usually 3 to 4 pieces, ship by DHL or FedEx in 4 to 6 days with courier freight paid by the buyer.\",\"All utility lines must be marked before excavation, and all vegetation and roots must be stripped below the surface to prevent regrowth.\"],\"qa_concise\":[{\"q\":\"What slope does an artificial turf base need?\",\"a\":\"A fall of roughly 1 to 2 percent away from buildings and hard edges, so water exits the surface instead of pooling.\"},{\"q\":\"How deep should the base be?\",\"a\":\"A 2 to 4 inch compacted base layer, with 3 to 4 inches recommended where ground movement is a concern.\"},{\"q\":\"Which roll widths are available?\",\"a\":\"2 m, 4 m and 5 m widths at 25 m long, plus custom seam-free widths made to the layout.\"}]}\n<\/script><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Ein schlechter Untergrund macht sich am ersten Tag nie bemerkbar. Der Rasen sieht bei der \u00dcbergabe makellos aus, und der erste starke Regen deckt jede Senke auf. In der zweiten Saison ragen die N\u00e4hte \u00fcber Vertiefungen heraus, die sich mit keinem Besen beseitigen lassen. Zu wissen, wie man sich auf die Kunstrasen-Installation vorbereitet, bedeutet, jeden Schritt in etwas zu verwandeln, das man \u2026 <a title=\"So bereiten Sie sich auf Ihre Kunstrasen-Installation vor\" class=\"read-more\" href=\"https:\/\/www.relyirgrass.com\/de\/prepare-for-your-artificial-turf-installation\/\" aria-label=\"Mehr Informationen \u00fcber Wie Sie sich auf Ihre Kunstrasen-Installation vorbereiten\">Weiterlesen<\/a><\/p>","protected":false},"author":2,"featured_media":2474,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"rank_math_title":"How to Prepare for Your Artificial Turf Installation","rank_math_description":"A contractor's checklist for artificial grass site preparation: measurements, clearing, drainage fall, base depth, compaction and delivery-day staging.","rank_math_focus_keyword":"how to prepare for your artificial turf installation","rank_math_robots":"","rank_math_canonical_url":"","rank_math_facebook_title":"","rank_math_facebook_description":"","rank_math_twitter_title":"","rank_math_twitter_description":"","_yoast_wpseo_title":"","_yoast_wpseo_metadesc":"","_yoast_wpseo_focuskw":"","_yoast_wpseo_canonical":"","_yoast_wpseo_meta-robots-noindex":"","_yoast_wpseo_meta-robots-nofollow":"","_yoast_wpseo_opengraph-title":"","_yoast_wpseo_opengraph-description":"","_yoast_wpseo_twitter-title":"","_yoast_wpseo_twitter-description":"","_aioseo_title":"","_aioseo_description":"","_aioseo_keywords":"","_aioseo_robots_default":"","_aioseo_robots_noindex":"","_aioseo_og_title":"","_aioseo_og_description":"","_aioseo_twitter_title":"","_aioseo_twitter_description":"","aiosp_title":"","aiosp_description":"","aiosp_keywords":"","_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_analysis_target_kw":"","_seopress_robots_canonical":"","_seopress_robots_index":"","_seopress_robots_follow":"","_seopress_social_fb_title":"","_seopress_social_fb_desc":"","_seopress_social_twitter_title":"","_seopress_social_twitter_desc":"","_genesis_title":"","_genesis_description":"","_genesis_canonical":"","_genesis_noindex":"","_genesis_nofollow":"","slim_seo":"","footnotes":""},"categories":[30],"tags":[],"class_list":["post-2796","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-installation-maintenance"],"_links":{"self":[{"href":"https:\/\/www.relyirgrass.com\/de\/wp-json\/wp\/v2\/posts\/2796","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.relyirgrass.com\/de\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.relyirgrass.com\/de\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.relyirgrass.com\/de\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.relyirgrass.com\/de\/wp-json\/wp\/v2\/comments?post=2796"}],"version-history":[{"count":2,"href":"https:\/\/www.relyirgrass.com\/de\/wp-json\/wp\/v2\/posts\/2796\/revisions"}],"predecessor-version":[{"id":3232,"href":"https:\/\/www.relyirgrass.com\/de\/wp-json\/wp\/v2\/posts\/2796\/revisions\/3232"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.relyirgrass.com\/de\/wp-json\/wp\/v2\/media\/2474"}],"wp:attachment":[{"href":"https:\/\/www.relyirgrass.com\/de\/wp-json\/wp\/v2\/media?parent=2796"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.relyirgrass.com\/de\/wp-json\/wp\/v2\/categories?post=2796"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.relyirgrass.com\/de\/wp-json\/wp\/v2\/tags?post=2796"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}